Absrtact |
This project is for the purposes of the management of the database building and the policy implementation.
The program has been operated for the follows:
1. According to the inspection results of all the 468 monitoring wells, 23 monitoring wells were maintained, and 12 monitoring wells were repaired.
2. The 46 well conditions of the monitoring wells were evaluated and the internal function have been checked., and according to the results of the well conditions, 24 regional or field-based monitoring wells were re-completed and 5 monitoring wells were excluded foreign materials. One monitoring well has been sealed.
3. 2 pollution sites improvement completion verification have been operated. The chemical analysis of one site showed that the concentration of 8 heavy metals in soil was higher than the Groundwater Pollution Control Standards. And the other showed that the concentration of 8 heavy metals in soil was higher than the Groundwater Pollution Monitoring Standards.
4. The
|
---|---|
Keyword |
soil pollution, groundwater pollution
|